Friday, August 25, 2006

Double Dome Sunrise 20060807 Rising280


 Posted by Picasa

60' Geodesic Dome 20060807 Rising280


29' Dome Extension Marked for Opening
Triangle Struts Trimmed on Rows 1 and 2 Posted by Picasa

60' Geodesic Dome 20060807 Rising280



Five Triangles Installed on Row 3
Trimming Rows 1 and 2  Posted by Picasa

60' Geodesic Dome 20060807 Rising280



Bedroom Drywalled and Triangles Trimmed Posted by Picasa

60' Geodesic Dome 20060807 Rising280



Kitchen Wall Rises 18' Floor to Dome
Curveture of Dome is Clearly Revealed by Straight Wall Posted by Picasa

60' Geodesic Dome 20060807 Rising280



Upper Bathroom Enclosed With Drywall
Triangle Trim Placed on Struts Posted by Picasa

60' Geodesic Dome 20060807 Rising280


Bedroom and Bathroom DryWalled
Trim Placed on Triangle Struts Posted by Picasa